MINIMUM BUDGET TOILET RENOVATION in RESIDENCE.at Powai .
BASIN WALL BEFORE
BASIN WALL AFTER RENOVATION...
With Glass Mosaic , Copper-silver leafing on ceiling and on mirror frame., Pearl finished light fixture , pearl candle stand and last i have covered the shaft door from copper finished Horizontal blinds.to make toilet look balanced in design. because i can not touch that shaft door location nor that aluminium frame.
SHOWER AREA BEFORE
SHOWER AREA AFTER RENOVATION
I have removed the bath tub , WC, basin and wall tiles.
used same existing concealed plumbing.
used same italian baisn marble counter
new bathroom flooring is laid on exisitnf tiles.
plumbing fixture and sanitary ware bought new form Grohe & Hindware.